Client | privat
Design | project management
Typology | residence
Location | Vienna
Stage | under construction
Area | 220m2
To preserve the surrounding an upper level was developed. Due to a short construction time the whole upper floor is a prefabricated timber construction - the ecological footprint should be minimized. The existing timber parts were reused and all other parts integrated to new building processes by selling or giving away. The intentional cuttings of the form arrange the facade and allow private outdoor spaces as well as following building hights by law.
Because of geopoitical crisis the houseĀ“s fate again ended in just small adaptations.